Daily Briefing — Friday, April 10, 2026
Nextracker Supply Chain · Rich Guy, Sr. Director
⚠ CHINA TRIP TOMORROW
1. Today — Friday, April 10
No meetings confirmed in calendar data. This is your last full work day before AA127 departs tomorrow 10:40am DFW. Treat today as trip close-out + delegation day.
Pre-Trip Must-Dos Today:
2. This Week — Remaining
Day Event Notes
Sat Apr 11 ✈ AA127 — DFW → Shanghai PVG
Departs 10:40am · Premium Economy · Conf: EZWDPF
Must confirm with Prashant TODAY. Arrives Apr 12 3:20pm local (PVG Terminal 2).
Completed this week (for context): Exec Review Yihua & Fator (Apr 3) · Stanley QBR + Bohrer/Stanley Legal on AvboltEco (Apr 6) · Section 232 effective (Apr 6, ~$60M annual savings) · Calibration Overview + Howmet QBR + SC Finance + Hydraulic Tool Check-in (Apr 7) · EU Mfg EMS + Rich/Akshay 1:1 + Vantage 2 Weekly (Apr 8)
3. Lookahead — China / SEA Trip (Apr 11–23) + Beyond
Dates Location Key Objectives & Open Issues
Apr 12–13 Shanghai Meet Shanghai team · Suspa (Nanjing): US qualification target Q3/Q4, $6.5/unit capex amortization
Apr 13–14 Suzhou area Baojia: CO2-reduced PPAP status (#28) · KMI: 60K slew commitment (~45K done), warranty 5→10yr history, remediation (#10)
Apr 14–15 Wenzhou Yihua/CZT (#20): GBA amendment close (1/4" & M12 volumes, IRA credit split, FEOC confirm, Thailand investment unlock) · FastFix rivet requalification — connect with Winter (#9) · Prashant add: HFT gearbox factory nearby
Apr 16 ✈ WNZ→TFU Air China 8335 · Departs 2:50pm · Conf: PCGTGF
Apr 17 Meishan / Chengdu ADD cost recovery (~450K EUR, NX 50% BTI position) · US import strategy · 1/4" AL pricing (12% above Stanley DDP) · Hybrid Battery Tool 2080 (#6, #18)
Apr 18 ✈ TFU→SIN Air China 403 · Departs 10:00am · Arrives SIN 3:00pm · Conf: NZ33EB
Apr 18–20 Malaysia (KL / Johor) Baojia Malaysia: slew drives · Fator: Amendment 2 close — decide: does Akshay join? · Batam (Indonesia): add if logistics work (DJ asked) (#22)
Apr 21 ✈ IPH→SIN→KHH Scoot 485 2:35pm (VB4Q9J) · China Airlines 758 6:15pm (A7F8Z8) · Arrive Kaohsiung 10:45pm
Apr 22 Kaohsiung, Taiwan Chenta: sustainability audit (recruitment fee findings still open, audit → late May) · NX120 6.5KN DC slews Sep '26 target · Yihua India vs Chenta India cost comparison (discuss with Prashant post-trip) (#10)
Apr 23 ✈ KHH→HKG→DFW CX431 11:40am → HKG · CX876 4:05pm → Dallas arrives 5:50pm (Conf: A7DUP4)
Post-Trip Milestones — Prep Needed Now Date Action Before Departing
VP+ Calibration Review window Apr 14–23 You're traveling the entire window — confirm what VP-level input (if any) is required from you
MBR Days 1 / 2 / 3 Apr 27–29, 10am–12pm Deck template is in Box; brief your team to prep slides before you land Apr 23
FY27 Offsite (placeholder) May 3–7 Location TBD — flag to EA for logistics
Compensation planning opens May 4 Review team levels now; Workday freeze (no job changes) through end of May
4. Teams Activity
Teams data not available for this briefing (Teams tab not found in Chrome).
5. Top 3 Priorities for Today
#1
Confirm China trip with Prashant — then prep or cancel.
CEO directive was issued Apr 2. Flight is tomorrow morning. If go: finalize per-supplier discussion docs (Suspa, KMI, Baojia, Yihua/CZT, Meishan, Fator, Chenta). If cancel: reassign Sunking + Akshay and protect key objectives (Yihua amendment, Chenta audit). This single decision gates the entire day's agenda.
#2
Calibration reviews + delegation brief — close out before you go offline.
Manager-level calibration deadline is Apr 13; you're in-flight/arriving Asia Apr 11–12. Complete remaining review inputs today. Then give Arif a written hold-the-fort brief covering: Boss Air requirements spec (Steve Kraft), Howmet BOMtail chase (Savannah Chambers, already overdue), Stanley NCR watch, Section 232 analysis for Yves. 13 days without active coverage is a real risk.
#3
Send Arif HR email + decline the Apr 14 compliance meeting.
The behavioral documentation email to Marie Washington + Prashant has been drafted and sitting. Send it before you leave the country. Then immediately send a decline for the Apr 14 Global Trade Compliance meeting (you'll be in Wenzhou). Two 2-minute tasks that will nag you the entire trip if left open.
Nextracker / Nextpower Supply Chain · Daily Briefing · April 10, 2026 · Confidential
``` Here's a summary of what's in the briefing: **Today** — No calendar meetings. It's a pre-trip prep day with 8 concrete action items, headlined by the China trip confirmation and the hard conflict: the Apr 14 Global Trade Compliance meeting falls squarely in the middle of the Wenzhou visit. **This Week** — Just tomorrow's flight. The "completed this week" block provides context on what was resolved (Stanley/Howmet QBRs, calibration kick-off, tariff effective date). **Lookahead** — Full trip itinerary Apr 11–23 broken into stops with specific objectives per supplier, plus the post-trip cliff: MBR Days 1/2/3 land four days after you get back, and the FY27 offsite is May 3–7. **Teams** — Not available; flagged to check manually, especially for Yves messages on tariff analysis and the Stanley legal outcome. **Top 3** — Ranked by impact: (1) confirm the trip now since it gates everything; (2) calibration + delegation brief before going dark; (3) send the Arif HR email and decline the compliance meeting — two quick tasks that will otherwise follow you to Shanghai.