|
Daily Briefing — Friday, April 10, 2026
Nextracker Supply Chain · Rich Guy, Sr. Director
|
⚠ CHINA TRIP TOMORROW
|
| Day | Event | Notes |
|---|---|---|
| Sat Apr 11 | ✈ AA127 — DFW → Shanghai PVG Departs 10:40am · Premium Economy · Conf: EZWDPF |
Must confirm with Prashant TODAY. Arrives Apr 12 3:20pm local (PVG Terminal 2). |
| Dates | Location | Key Objectives & Open Issues |
|---|---|---|
| Apr 12–13 | Shanghai | Meet Shanghai team · Suspa (Nanjing): US qualification target Q3/Q4, $6.5/unit capex amortization |
| Apr 13–14 | Suzhou area | Baojia: CO2-reduced PPAP status (#28) · KMI: 60K slew commitment (~45K done), warranty 5→10yr history, remediation (#10) |
| Apr 14–15 | Wenzhou | Yihua/CZT (#20): GBA amendment close (1/4" & M12 volumes, IRA credit split, FEOC confirm, Thailand investment unlock) · FastFix rivet requalification — connect with Winter (#9) · Prashant add: HFT gearbox factory nearby |
| Apr 16 | ✈ WNZ→TFU | Air China 8335 · Departs 2:50pm · Conf: PCGTGF |
| Apr 17 | Meishan / Chengdu | ADD cost recovery (~450K EUR, NX 50% BTI position) · US import strategy · 1/4" AL pricing (12% above Stanley DDP) · Hybrid Battery Tool 2080 (#6, #18) |
| Apr 18 | ✈ TFU→SIN | Air China 403 · Departs 10:00am · Arrives SIN 3:00pm · Conf: NZ33EB |
| Apr 18–20 | Malaysia (KL / Johor) | Baojia Malaysia: slew drives · Fator: Amendment 2 close — decide: does Akshay join? · Batam (Indonesia): add if logistics work (DJ asked) (#22) |
| Apr 21 | ✈ IPH→SIN→KHH | Scoot 485 2:35pm (VB4Q9J) · China Airlines 758 6:15pm (A7F8Z8) · Arrive Kaohsiung 10:45pm |
| Apr 22 | Kaohsiung, Taiwan | Chenta: sustainability audit (recruitment fee findings still open, audit → late May) · NX120 6.5KN DC slews Sep '26 target · Yihua India vs Chenta India cost comparison (discuss with Prashant post-trip) (#10) |
| Apr 23 | ✈ KHH→HKG→DFW | CX431 11:40am → HKG · CX876 4:05pm → Dallas arrives 5:50pm (Conf: A7DUP4) |
| Post-Trip Milestones — Prep Needed Now | Date | Action Before Departing |
|---|---|---|
| VP+ Calibration Review window | Apr 14–23 | You're traveling the entire window — confirm what VP-level input (if any) is required from you |
| MBR Days 1 / 2 / 3 | Apr 27–29, 10am–12pm | Deck template is in Box; brief your team to prep slides before you land Apr 23 |
| FY27 Offsite (placeholder) | May 3–7 | Location TBD — flag to EA for logistics |
| Compensation planning opens | May 4 | Review team levels now; Workday freeze (no job changes) through end of May |
| #1 |
Confirm China trip with Prashant — then prep or cancel.
CEO directive was issued Apr 2. Flight is tomorrow morning. If go: finalize per-supplier discussion docs (Suspa, KMI, Baojia, Yihua/CZT, Meishan, Fator, Chenta). If cancel: reassign Sunking + Akshay and protect key objectives (Yihua amendment, Chenta audit). This single decision gates the entire day's agenda.
|
| #2 |
Calibration reviews + delegation brief — close out before you go offline.
Manager-level calibration deadline is Apr 13; you're in-flight/arriving Asia Apr 11–12. Complete remaining review inputs today. Then give Arif a written hold-the-fort brief covering: Boss Air requirements spec (Steve Kraft), Howmet BOMtail chase (Savannah Chambers, already overdue), Stanley NCR watch, Section 232 analysis for Yves. 13 days without active coverage is a real risk.
|
| #3 |
Send Arif HR email + decline the Apr 14 compliance meeting.
The behavioral documentation email to Marie Washington + Prashant has been drafted and sitting. Send it before you leave the country. Then immediately send a decline for the Apr 14 Global Trade Compliance meeting (you'll be in Wenzhou). Two 2-minute tasks that will nag you the entire trip if left open.
|